New construction of photovoltaic plant at WWTP Eich

Bassersdorf, Switzerland

The association that manages the Bassersdorf wastewater treatment plant, which includes the municipalities of Bassersdorf, Lindau and Nürensdorf, has set the course for the transition to renewable energy. A photovoltaic system with an output of over 300 kWp was installed above the clarifying tank of the wastewater treatment plant. The wastewater continues to be treated below the solar panels. The solar panels can be automatically retracted and parked in their own ‘garage’ at night, during bad weather or for maintenance work.
The electricity produced by the plant is mainly used to operate the wastewater treatment plant, and only a small part is fed into the public grid.

TBF was responsible for general coordination, the photovoltaic system and its structural connection to the existing infrastructure.

Locations Switzerland

TBF + Partner AG
Schwanengasse 12
3011 Bern
TBF + Partner AG
Quai du Seujet 10
1201 Geneva
TBF + Partner AG
Via Besso 42
6900 Lugano
TBF + Partner AG
Beckenhofstrasse 35
Postfach
8042 Zurich

Locations Germany

TBF + Partner AG
Alsterarkaden 9
20354 Hamburg
TBF + Partner AG
Mauerkircherstrasse 9
81679 Munich
TBF + Partner AG
Schlossstrasse 70
70176 Stuttgart

Location in Italy

TBF + Partner S.r.l.
Via Pola 11
20124 Milan