Limit results
Trusted Advisor
Project
Stories
Events
Job Offer
No results found
TBF + Partner

Renewal of Bioggio WWTP

Bioggio, Switzerland

The wastewater treatment plant in Bioggio was last renovated 25 years ago and thus needs to be revamped both to satisfy the general need for renovation and to adapt to new environmental requirements. The measures were gradually implemented. First, the entire sludge treatment system was renovated and expanded, and a new exhaust air treatment system was installed to prevent odour emissions. Then the wastewater line was repaired and partly redesigned and equipped with an additional treatment process for the separation of micropollutants.

The capacity of the plant makes it the largest in Ticino.

Locations Switzerland

TBF + Partner AG
Schwanengasse 12
3011 Bern
TBF + Partner AG
Quai du Seujet 10
1201 Geneva
TBF + Partner AG
Via Besso 42
6900 Lugano
TBF + Partner AG
Beckenhofstrasse 35
Postfach
8042 Zurich

Locations Germany

TBF + Partner AG
Calwer Strasse 7
71034 Böblingen
TBF + Partner AG
Alsterarkaden 9
20354 Hamburg
TBF + Partner AG
Mauerkircherstrasse 9
81679 Munich

Location in Italy

TBF + Partner S.r.l.
Via Pola 11
20124 Milan