Limit results
No results found
TBF + Partner

Rehhag district heating plant

Bern, Switzerland

An additional district heating plant with a peak output of 15 MWth commissioned by Energie Wasser Bern (ewb) is being built in the west of Bern. TBF is responsible for the overall project management as well as technical planning in the areas of plant engineering, ICE systems and construction.

According to the city of Bern’s energy structure plan, at least 70% of the planned heat generation must come from renewable sources. In order to ensure compliance with the requirement, the district heating is generated by two wood-fired boilers and thus primarily on the basis of a fossil fuel. To cover the necessary redundancies and district heating spikes, a gas-fired hot water boiler and heat accumulators are used. The district heating plant is planned as an autonomous production facility and will be operated as such in the first phase. With the planned expansion of the district heating network, it will be integrated into ewb’s overall district heating network in the years to come.

Locations Switzerland

TBF + Partner AG
Schwanengasse 12
3011 Bern
TBF + Partner AG
Quai du Seujet 10
1201 Geneva
TBF + Partner AG
Via Besso 42
6900 Lugano
TBF + Partner AG
Beckenhofstrasse 35
Postfach
8042 Zurich

Locations Germany

TBF + Partner AG
Alsterarkaden 9
20354 Hamburg
TBF + Partner AG
Mauerkircherstrasse 9
81679 Munich
TBF + Partner AG
Schlossstrasse 70
70176 Stuttgart

Location in Italy

TBF + Partner S.r.l.
Via Pola 11
20124 Milan