Limit results
No results found
TBF + Partner

Limeco - New construction of power-to-gas plant

Dietikon, Switzerland

Limeco is building the first industrial-scale power-to-gas plant with biological methanation in Switzerland in Dietikon. The sewage gas produced in the WWTP is completely converted into green gas with the addition of hydrogen by means of biological methanation. The hydrogen is produced by electrolysis and renewable electricity from the local waste incineration plant.

The plant is a lighthouse project of national importance regarding the planned transformation of the energy system as part of the Energy Strategy 2050.

The building is designed as a prefabricated timber element structure, which is erected on a concrete table in cast-in-place concrete.

In addition to the overall project management, TBF is responsible for the technical planning of construction, building services and process engineering. During the building permit procedure, TBF prepared a noise assessment for the plant.

Locations Switzerland

TBF + Partner AG
Schwanengasse 12
3011 Bern
TBF + Partner AG
Quai du Seujet 10
1201 Geneva
TBF + Partner AG
Via Besso 42
6900 Lugano
TBF + Partner AG
Beckenhofstrasse 35
Postfach
8042 Zurich

Locations Germany

TBF + Partner AG
Alsterarkaden 9
20354 Hamburg
TBF + Partner AG
Mauerkircherstrasse 9
81679 Munich
TBF + Partner AG
Schlossstrasse 70
70176 Stuttgart

Location in Italy

TBF + Partner S.r.l.
Via Pola 11
20124 Milan